Met Opera: Rusalka TX

Transmission ceased at 22:07GMT – Clean & stable throughout content
Content concludes at 22:01GMT
There is a fog effect at about 40 minutes into the first act.  Do not adjust your sets
17:40GMT vision disturbance noted on IS905 & Eu7a
17:10GMT slight vision disturbance as WIN switch between transatlantic paths
16:46GMT EU5Wa resolved. Remux fault cleared at WIN
16:30GMT Several callers unable to lock to EU5Wa – investigating
16:05GMT pictures to line on IS10-02
16:00GMT: IS10-02 carriers established – currently no pictures, will switch content to line shortly

Lets hope that you all have your antenna perfectly aligned as its likely there will be significant rain fade this afternoon, especially in the West of the UK.

The tuning period for today’s transmission will begin at 16:00GMT/17:00CET

This entry was posted in Met Opera. Bookmark the permalink.