Matisse Live from Tate Modern: MAIN TX

The feed is now up and stable on both IS-1002 and IS-905

The test runs until 1855BST: then the main programme starts.

It is scheduled to run to 2100BST

 

 

This entry was posted in Uncategorized. Bookmark the permalink.