The feed is now up and stable on both IS-1002 and IS-905
The test runs until 1855BST: then the main programme starts.
It is scheduled to run to 2100BST
The feed is now up and stable on both IS-1002 and IS-905
The test runs until 1855BST: then the main programme starts.
It is scheduled to run to 2100BST