UPDATE: 0951GMT. The Test-loop feed is up and stable on both satellites. There are NO SUBTITLES on this test feed
The Test for this event is at 1000GMT/1100BST~UK/1200CEST~W.Europe.
The Test loop will be on IS-100 and IS-905 and will be there for 60′. The content is the Arqiva “Digital Cinema Delivered” test loop.