UPDATE@1504BST. The feed is now up and stable on all paths.
The Test period for the 1st production of the 2016-17 Season will start at 1500BST/1600CEST. The feed is carried on IS-1002 , IS-905 and E5Wa.
The Walk-In starts at 1655BST.
UPDATE@1504BST. The feed is now up and stable on all paths.
The Test period for the 1st production of the 2016-17 Season will start at 1500BST/1600CEST. The feed is carried on IS-1002 , IS-905 and E5Wa.
The Walk-In starts at 1655BST.