The Test period begins at 1300GMT/1400CET and the service is carried on IS-1002 and IS-905.
Walk-In from 1340GMT and the production introduction is at 1400GMT
The Test period begins at 1300GMT/1400CET and the service is carried on IS-1002 and IS-905.
Walk-In from 1340GMT and the production introduction is at 1400GMT