The first production of the 2019-20 Season is “TURANDOT” today. The Test epriod on E5Wa and IS-1002 starts at 16:30BST/17:30CEST.
Additional details will be added here as required during the production.
The first production of the 2019-20 Season is “TURANDOT” today. The Test epriod on E5Wa and IS-1002 starts at 16:30BST/17:30CEST.
Additional details will be added here as required during the production.